Te Herenga Waka-Victoria University of Wellington confirms world-leading Living Pā investment

529
SP Jain, Campus Placement

National, 21st December 2021: The Te Herenga Waka —Victoria University of Wellington Council has confirmed its financial commitment to developing the University’s marae precinct into a Living Pā that is one of the world’s most environmentally responsible buildings and will become a new icon for Wellington and Aotearoa.

Online Internship with Certification

Important Announcement – EasyShiksha has now started Online Internship Program “Ab India Sikhega Ghar Se

How EasyShiksha Internship/Training Program Works
How EasyShiksha Internship/Training Program Works

The Council confirmed investment of up to $45 million in the Living Pā project on the same day (6 December) on which the University’s wharenui (carved house), Te Tumu Herenga Waka, was opened 35 years ago.

The Living Pā redevelops Te Herenga Waka Marae as a hub where people are empowered to work, teach, and learn sustainably in a building that meets the most rigorous environmental standards in the world, the Living Building Challenge principles.

The Council allocated a preliminary tranche of financial support to the project a year ago, allowing site work to be carried out during 2021. Fundraising is also underway to ensure the project delivers the maximum benefits as a purpose-built living lab that is an incubator for innovation, and a place for multiple communities and disciplines to come together to discuss how we can build a more equitable, fair, and sustainable society.

Te Herenga Waka Chancellor Neil Paviour-Smith says the Living Pā is an exciting initiative that encapsulates the best of the University and its future.

Top Courses in Computer Science Engineering

Top Courses in Software Engineering

Loading...

More Courses With Certification

“The University Council is delighted to be in a position to commit to this transformative and visionary project on the eve of the University’s 125year celebrations. 

“It truly symbolises the aspiration of the University set out in the strategic plan. A global-civic, capital city university with our marae at our heart. This will be a space that demonstrates our commitment to sustainability, research excellence, and a great student experience.”

Work carried out on the site of the Living Pā this year has seen several houses on Kelburn Parade deconstructed.

In keeping with the principles underpinning the project, all salvageable material inside the houses, including native timbers, fireplaces, fittings, fixtures, windows, doors, roofing sheet and sarking, have been removed by a contractor who salvages buildings in accordance with requirements under the certification of the Living Building Challenge.

Empower your team. Lead the industry

Get a subscription to a library of online courses and digital learning tools for your organization with EasyShiksha

Request Now
Frequently Asked Questions

Construction of the Living Pā building can now begin in April next year with the gold standard facility expected to be completed in 2024.

Between now and April, New Zealand company Red Stag Timber will be prototyping and testing new cross-laminated timber components for the Living Pā—a new approach to the typical one of making base components of a building from concrete.

The components are carbon sequestering, meaning they will capture and store carbon, contributing towards the Living Pā being a carbon positive building, while also providing the required dynamic performance in an earthquake and, importantly, meeting the design intent of the Living Pā.

Deputy Vice-Chancellor Professor Rawinia Higgins said Council confirmation of its financial support was an exciting milestone for the project and for the University as a whole.

“The overarching vision of the Living Pā has always been about building our community as a university, reflecting our Te Herenga Waka name. An investment in the Living Pā is an investment in our people—Māori and non-Māori, students, staff, and our wider external communities.

“The Living Pā is an important component of our objective towards strengthening and growing the Iho of the University to position Te Herenga Waka for the future. Our goal is to grow the number of Māori students and staff, making Te Herenga Waka the first-choice university for Māori and for those who believe in our global civic mission. The Living Pā is not only a strong physical representation of the University’s vision but also the platform from which we can give effect to the Iho across the whole university.”

About Education New Zealand:

Education New Zealand (ENZ) is New Zealand’s government agency for international education. ENZ works to grow awareness of New Zealand as a study destination and to support New Zealand education providers and businesses to take their services and products abroad.

For more related content visit Easyshiksha and Hawkscode  

ALSO READ: Learn from the Masters: Yellow Class collaborates with World

Get Course: brush-pen-lettering-modern-calligraphy-course-for-beginners

Download this article as PDF to read offline: